Execution of construction works for Two potable water pipelines – 1400 mm (16 bar) & 1100 mm (10 bar).
Two potable water pipelines – 1400 mm (16 bar) & 1100 mm (10 bar) Prestressed Concrete Pipes (PCP), including supply, installation, and testing
Two potable water pipelines – 1400 mm (16 bar) & 1100 mm (10 bar) Prestressed Concrete Pipes (PCP), including supply, installation, and testing